View Single Post
Old May 12, 2019, 11:49 AM   #42
Bart B.
Senior Member
 
Join Date: February 15, 2009
Posts: 8,927
Is leveling the scope a process that ends up with the LOF (bore axis) tracking the vertical reticle wire as the scope elevation is moved from stop to stop?

Last edited by Bart B.; May 12, 2019 at 02:37 PM.
Bart B. is offline  
 
Page generated in 0.03236 seconds with 8 queries