View Single Post
Old May 24, 2013, 06:45 PM   #2
big al hunter
Senior Member
 
Join Date: March 12, 2011
Location: Washington state
Posts: 1,558
You might try building a screening table. I would go with a 2x12 Douglas fir frame with 1/4 inch wire fabric bottom. About 4 ft by 4 ft should hold more than a concrete mixer.( that calcs to over 100 gallons.) Then hang it in a rack so you can swing it back and forth. Put another box with a plywood bottom under it so you can reclaim the media.
__________________
You can't fix stupid....however ignorance can be cured through education!
big al hunter is offline  
 
Page generated in 0.03316 seconds with 8 queries