View Single Post
Old January 13, 2013, 09:45 AM   #9
Senior Member
Join Date: January 20, 2009
Location: Amity Oregon
Posts: 464
I built a stand alone concrete block "box" with a used vault door on it.
Rebar every 6" drilled into the slab, then filled with concrete. Door
is a Diebold class A security 2 hr fire rated door from a records vault.
The local security company upgraded the door, sold me the used one for

Inside dimensions 6ftx7ftx8ft. Should have made it bigger.
BillM is offline  
Page generated in 0.07626 seconds with 7 queries