|
FWIW, With the assembled action in hand, why not just make a few measurements from a little beyond the mainspring's rear anchor point, to the hammer attachment point, and go from there to fashion a new mainspring 2/3'd the width of the tang at the rear anchor end, tapering to whatever width was needed to swing with the hammer ?
.
|